
ONE OF THE BIGGEST INFRASTRUCTURE PROJECTS IN THE REGION TOOK ANOTHER STEP FORWARD YESTERDAY.....AS THE OFFICIAL DESIGN FOR THE NEW "BRENT
SPENCE BRIDGE COMPANIION SPAN" WAS UNVEILED......
THE NEW.....STATE OF THE ART CABLE.....STRAYED STRUCTURE.....WHICH WILL CARRY BOTH I-71 AND I-75 TRAFFIC ACROSS THE OHIO RIVER AT COVINGTON.....IS
AIMED AT REDUCING CONGESTION ON THE EXISTING "BRENT SPENCE BRIDGE"......
THE BRIDGE IS BEING BUILT WITH NO TOLLS AND IS EXPECTED TO SIGNIFICANTLY IMPROVE TRAFFIC FLOW AND SAFETY......